Key takeaways
Anduril was already on Webflow, but the original build had become a go-to-market bottleneck: updates were slow and new pages needed workarounds.
Beqi rebuilt the architecture and component system and shipped new pages in 10 days, then kept improving the site over eight weeks.
Anduril reported a 35%+ faster go-to-market, and the work shipped with zero missed deadlines.
The Challenge
Anduril was already on Webflow. The build was slowing it down.
Anduril builds defense technology and autonomous systems, and its website has to keep pace with product news, recruiting, investors and media moments.
But the original Webflow implementation had not been built for speed. Updates took longer than they should have, new pages needed workarounds, and every launch felt heavier than the marketing need behind it.
Left as it was, the architecture would tax every page, campaign and update the team shipped.
Why a rebuild, not a cleanup
The bottlenecks were structural. A surface cleanup would have kept the same workarounds in place, so Beqi rebuilt the architecture itself.
The Solution
Beqi rebuilt Anduril's Webflow architecture in 10 days and shipped new pages on the new foundation.
- Component system. Sections rebuilt so they could be reused, maintained and extended without adding technical debt.
- CMS and page foundations. Restructured around how Anduril's team works after launch: editorial usability, development speed and responsive consistency.
- New pages. Built on the new architecture within the same 10 days.
- Improvements after launch. Beqi kept working with the team on improvements and updates for eight weeks.
Team and timeline
- 10 days. Architecture rebuild and new page development.
- 8 weeks. The full engagement, including ongoing improvements and updates.
- Zero missed deadlines. Every delivery landed on the agreed date.
The Results
Webflow stopped being a bottleneck and became a fast platform for a company moving at high speed.
- 35%+ faster go-to-market. With reusable components and a cleaner structure, pages went from plan to launch faster, with fewer internal blockers.
- New pages without workarounds. The rebuilt architecture let the team build with more consistency and less rework.
- No missed deadlines. The rebuild and new pages shipped in 10 days, on schedule.
About these results
FAQs
Beqi rebuilt Anduril's Webflow architecture and component system and shipped new pages, removing the structural bottlenecks that slowed marketing.
Ten days for the architecture rebuild and new pages, then eight weeks of further improvements and updates.
Anduril reported a 35%+ improvement in go-to-market speed, and the work shipped with zero missed deadlines.
Yes. Being on Webflow was not enough: the quality of the build decides whether the platform creates speed or friction.
A rebuild of the structure under an existing Webflow site, its components, CMS and page foundations, so the team can ship quickly again. Anduril's rebuild took 10 days.

