35% faster go-to-market, unlocked in 10 days

How Beqi rebuilt Anduril's Webflow architecture in 10 days so the marketing team could ship pages faster without adding technical debt.

35%+

Faster go-to-market after the rebuild

10 days

To rebuild the architecture and ship new pages

0

Missed deadlines across the engagement

FROM THE CLIENT

"Beqi has skillfully restructured the main pages, leading to improved performance and effortless updates without any issues. This change resulted in a 35% faster GTM."
Joseph Chen, Co-Founder of Anduril Industries

Joseph Chen

Co-Founder, Anduril Industries

Key takeaways

Anduril was already on Webflow, but the original build had become a go-to-market bottleneck: updates were slow and new pages needed workarounds.

Beqi rebuilt the architecture and component system and shipped new pages in 10 days, then kept improving the site over eight weeks.

Anduril reported a 35%+ faster go-to-market, and the work shipped with zero missed deadlines.

01

The Challenge

Anduril was already on Webflow. The build was slowing it down.

Anduril builds defense technology and autonomous systems, and its website has to keep pace with product news, recruiting, investors and media moments.

But the original Webflow implementation had not been built for speed. Updates took longer than they should have, new pages needed workarounds, and every launch felt heavier than the marketing need behind it.

Left as it was, the architecture would tax every page, campaign and update the team shipped.

Why a rebuild, not a cleanup

The bottlenecks were structural. A surface cleanup would have kept the same workarounds in place, so Beqi rebuilt the architecture itself.

02

The Solution

Beqi rebuilt Anduril's Webflow architecture in 10 days and shipped new pages on the new foundation.

  • Component system. Sections rebuilt so they could be reused, maintained and extended without adding technical debt.
  • CMS and page foundations. Restructured around how Anduril's team works after launch: editorial usability, development speed and responsive consistency.
  • New pages. Built on the new architecture within the same 10 days.
  • Improvements after launch. Beqi kept working with the team on improvements and updates for eight weeks.

Team and timeline

  • 10 days. Architecture rebuild and new page development.
  • 8 weeks. The full engagement, including ongoing improvements and updates.
  • Zero missed deadlines. Every delivery landed on the agreed date.
03

The Results

Webflow stopped being a bottleneck and became a fast platform for a company moving at high speed.

  • 35%+ faster go-to-market. With reusable components and a cleaner structure, pages went from plan to launch faster, with fewer internal blockers.
  • New pages without workarounds. The rebuilt architecture let the team build with more consistency and less rework.
  • No missed deadlines. The rebuild and new pages shipped in 10 days, on schedule.

Visit the live site: anduril.com

About these results

FAQs

What did Beqi do for Anduril Industries?
How long did the project take?
What were the results?
Was the site already on Webflow?
What is a Webflow rescue?
Next case study

Quo

Trusted by 140+ enterprise and fast-growing teams

Remove the Webflow bottlenecks behind your next launch.

When every page needs a workaround, it's time to review the architecture. Let's plan a Webflow rescue around cleaner components, easier updates and the way your team works.